The system is designed by a specialist, reviewed by the local branch of the state environmental agency, and if all is according to code, approved for installation. This is done before you even get a building permit. Some people believe the system is just a big tank that is dropped into a hole in the ground. Not so!!! There is a tank, but so much more!





One of the six trenches for the drain field. We had to wait until the ground was workable enough to dig before tackling this project. Once the tank was in, the trenches were dug and drain/filter pipe was set in place. (Notice all the rocks? We have an abundant supply of them!)

More trenches--and rocks!

The tank that the trenches branch off from.

Kind of a mess! Once everything is in place, the county environmental inspector comes to give the final word. Luckily, we passed without having to make any adjustments or modifications. We were actually very relieved since the water level is higher now than it was when we had the original drainage testing. Now that it is official, everything gets covered back up and we schedule a final inspection for a letter of occupancy.